Calcaire - Build / by Anna Slowey

This last week brought exciting updates as the massive steel bent is lifted up and over into place at Calcaire  to begin the formation of the gable end at the main entry. Only one more steel delivery until we can finish roofing the entire structure and really begin to visualize the scale and height of these grand gable spaces. More more progress posts of Calcaire, click into the "Calcaire" tag below the post.

View of the installed bent - the structural framework perpendicular to the length of the gable designed to carry lateral and vertical loads

View of hall towards Master Gable

View of hall towards Master Gable

Master Suite gable in progress

Master Suite framing partition wall between bedroom and bath

Master Suite framing partition wall between bedroom and bath

Sunken wine cellar; Clubhouse awaiting it's steel framework

Sunken wine cellar; Clubhouse awaiting it's steel framework